SW 6 & 7 Assessment


•Land area method (Equivalent Parcel = EP)  for construction of water and irrigation distribution lines and wastewater collection lines. Scalable based on 10,000 sq. ft. parcel area.


Water and Irrigation Distribution and Wastewater Collection

Water

Sewer

Irrigation

Total

         

Land Area Assessment Per 1 EP = 10,000 SF

$2,901.09

$5,285.85

$1,820.57

$10,007.51



 
•Equivalent Residential Unit (ERU) method for Capital Facility Expansion Charge (CFEC). Fixed at 1 ERU per parcel with a 5/8” meter.


Capital Facility Expansion Charge

Water

Sewer

Irrigation

Total

         

System Demand Units  Per 1 ERU (5/8” meter - receiving all three utilities)

$1,516

$4,476

$758

$6,750



•$10,008 per EP Assessment for SW 6 & 7 is one of the lowest assessed cost of any previous UEP.
 
•Lowest financing costs for any UEP project.
 
•20 % discount on the CFEC.                                                                       
 
•The Prepayment period was approximately 1 year.